BEGIN:VCALENDAR
VERSION:2.0
PRODID:spatie/icalendar-generator
NAME:Overbuilding of grid connections – The new Section 8a (3) EEG in pra
 ctice [HUSUM WIND 2025]
X-WR-CALNAME:Overbuilding of grid connections – The new Section 8a (3) EE
 G in practice [HUSUM WIND 2025]
BEGIN:VTIMEZONE
TZID:Europe/Zurich
BEGIN:DAYLIGHT
DTSTART:20250330T020000
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20251026T030000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
DTSTART:20250907T035834
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
UID:6a20f7ea0f3f2
DTSTAMP:20260604T035834Z
DTSTART;TZID=Europe/Zurich:20250918T140000
DTEND;TZID=Europe/Zurich:20250918T142000
SUMMARY:Overbuilding of grid connections – The new Section 8a (3) EEG in 
 practice [HUSUM WIND 2025]
DESCRIPTION:https://husum-wind.conteo.site/en/e/overbuilding-of-grid-connec
 tions-the-new-section-8a-3-eeg-in-practice.66678\n\nThe obligation of grid
  operators to allow overbuilding of grid connections presents new challeng
 es. In his presentation\, our expert Dr. Michael Stopper will examine thes
 e issues in more detail
LOCATION:Hall 3\, booth C25